TechflierTechflierTechflier
  • Home
  • News
  • Features
  • Spotlight
  • About
    • Mission
    • Services
    • Contact
  • Newsletter
  • Shop
    • All Items
    • By Category
      • Bags
      • T-Shirts
    • Cart
Search
© 2025 Techflier. All Rights Reserved.
Reading: Kairos Power taps Samsung’s builder arm for its Google reactor
Share
Font ResizerAa
TechflierTechflier
Font ResizerAa
  • Home
  • News
  • Features
  • Spotlight
  • About
  • Newsletter
  • Shop
Search
  • Home
  • News
  • Features
  • Spotlight
  • About
    • Mission
    • Services
    • Contact
  • Newsletter
  • Shop
    • All Items
    • By Category
    • Cart
Have an existing account? Sign In
Follow US
© 2025 Techflier. All Rights Reserved.
News

Kairos Power taps Samsung’s builder arm for its Google reactor

An equity stake plus in-kind engineering is worth up to 100 million dollars to the nuclear startup.

Techflier Staff
Last updated: September 22, 2026 7:18 pm
Techflier
Share
SHARE

Kairos Power has brought in Samsung’s engineering arm to help build the 50-megawatt demonstration reactor it owes Google, a package that combines equity with construction know-how.

Samsung C&T will hand over $70M as a stake in Kairos and add “in-kind” engineering services, putting the total value of the arrangement at up to $100M. The contractor’s resume runs to roughly a dozen nuclear projects, some built alone and some as a partner.

Construction is underway at the company’s Oak Ridge, Tennessee site, where two reactors are being built. Hermes 1, the smaller of the pair, is a demonstrator running at low power, and its purpose is to sharpen the commercial blueprint. Hermes 2, the one that matters commercially, is a fluoride salt-cooled, high-temperature reactor of a class the industry has talked about for years without putting one into service. Power from the site forms the opening 50 megawatts of the Google pact.

Data centers set the pace

The relationship dates to the fall of 2024, when Google signed its first agreement and asked for about half a gigawatt of nuclear capacity by 2035. Demand from AI data centers has turned reactor startups into a hot category. Kairos runs on TRISO fuel, in which tiny uranium seeds sit inside layers of ceramic and carbon that are packed into billiard ball-sized spheres, an arrangement designed to make a meltdown far less likely.

To keep up with the promised schedule, Kairos has to move faster on every reactor that follows Hermes 2, which is where Samsung’s building muscle comes in.

Manganese flow battery firm Certain Energy banks £10M for grid storage
Microsoft’s Clean Energy Dilemma: What the AI Data Center Boom Means for Startup Founders
Supervised Wayve robot rides arrive in Uber’s London app
Finnish hyperspectral satellites map Afghanistan’s hidden poppy fields
Shein offers $1.1B investor payouts ahead of Hong Kong listing
TAGGED:advanced reactorsdata centersGoogleKairos Powernuclear energySamsung
SOURCES:TechCrunch
Share This Article
Facebook Copy Link Print
Previous Article Balderton bets €18.3M on Spott’s recruitment software rebuild
Next Article Frontier labs get a UN Security Council hearing on AI risk

Get Some Gear

 

 

 

 

Quick Links

  • News
  • Features
  • Spotlight
  • Newsletter
  • Store

About Techflier

  • About Techflier
  • Services
  • Contact Us
  • Privacy
  • Legal

Indices

TechflierTechflier
Follow US
© 2026 Techflier. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?